Case studies

Fire systems – Tregantle Fort
Due to the fire booster being unreliable and not able to confirm with the current standards, we designed and constructed a new complaint system in a very restricted space.

Standard designs – St Neots WWTW
The existing scum removal system at St Neots WWTW incorporated the beach type scum box and was in a very poor condition.

General electrical : Barcombe Water Treatment Works
The existing HV starters and motors were time expired and there was a requirement to replace this equipment and at the same time change the operating voltage from a 3.3kV to 690V.

Huntington WTW
Huntington WTW is designated a ‘top tier’ site under the Control of Major Accident Hazards (COMAH) Regulations and is one of the top three sites in the UK in terms of potential impact.

Seedy Mill Water Treatment Works
IWS engaged with Degremont (the intellectual property owners) to assess the possibility of refurbishing the accelators to improve their performance against current water quality requirements.

Langham Water Treatment Works
The filter block assets at Langham WTW, some of which dated back to 1931 when it was constructed, were showing their age and in need of investment.