AW energy team and IWS operate a proactive performance test program to identify candidates for Water Pumping Efficiency savings schemes.
Refurbishing the 35% inefficient pump sets would have restored their efficiency back to 57% replacing the units restored the operating efficiency back to 75%.
Project Statistics
- Time to deliver 10 Weeks
- Cost to deliver £23K
- Savings per annum £5.46k
- 64,974 kWh
- 34.89 tonnes CO2
- Energy payback period 4.08 years

An Engineering Guide
- When to replace and when to refurbish
- Ensure the pumpset is fit for purpose
- Design for today with an infrastructure for the future demand
- 90% of the life cycle cost is Opex expenditure, therefore, maximise operating efficiency